White River Hydroelectric Project :

Location: Marathon, Ontario

Client: Dragados Canada, Inc.

Transmission Line Voltage: 115kV

Transmission Line Length: 24km

Structure Type: Single Wood Pole Wishbone

Major River Crossing: White River

Major Highway Crossing: Trans-Canada Highway 17

Rough Terrain: 100% offroad construction

Project Map:

Top